R & D SCHEMES (PORT SECTOR) COMPLETED DURING LAST FEW YEARS
|
Sl No.
|
Name of the scheme
|
Cost (Rs. In lakh) |
Project proponent
|
Date of completion
|
|
1
|
Design of Coastal Defence Works.
|
2.17
|
IIT Chennai
|
May 1997
|
|
2
|
Different types of berthing structures and development of standard designs. |
6.77
|
IIT Chennai
|
June 2001
|
|
3
|
Problem of siltation in estuarine ports. |
29.00
|
CWPRS, Pune& Cochin Port |
April 2002
|
|
4
|
Hydrodynamic behaviour of floating Breakwater. |
11.75
|
IIT Chennai
|
April 2002
|
|
5
|
Role of shipping activity and ship fouling in TBT pollution in some harbour of West Coast of India. |
24.08
|
NIO Goa
|
Sep 2003
|
|
6
|
Development of Marine Flyash Concrete and evaluation of its performance wrt physio chemical and biological factor in marine water. |
17.27
|
NIO Goa
|
October 2004
|
|
7 |
Study of the impact of alluvial meanders &tributaries on the Bhagirathi Hugli River system. |
19.88
|
Kolkata Port
|
August 2009
|
|
8 |
Improving durability and strength of plain andreinforced concrete structure with addition of ground-granualted blast furnace slag(GGBFS). |
6.00
|
IIT Roorkee
|
Sep 2010
|
|
9 |
Interaction of ships with basin entrance andapproach channels. |
32.77
|
IIT Chennai
|
June 2012
|
|
10 |
FRP Laminated Sandwich panels forbridges/walkways of Marine Structures. |
24.43
|
IIT, Roorkee
|
Sep 2014
|
|
11 |
Durability and Strength Enhancement of Reinforced Concrete Columns using Unplasticised Poly Vinyl Chloride (UPVC)Tubes in Ports, Harbours and Off-Shore Structures |
20.28
|
IIT, Roorkee |
July 2015
|
|
12 |
Geo-Hydro-Morphological studies of three tributaries and their impact onsedimentation with respect to some critical stretches inHooghly River and Estuary. |
46.43
|
Kolkata PortTrust
|
Nov 2015
|
|
13 |
Use of Dredged Material duringMaintenanceDredging in the Hugli Estuary. |
30.00
|
Kolkata PortTrust
|
March 2016
|
|
14 |
Implementation of Pilot Project in connection with Short-Term and Long Term measures for improvement of draft in the Hooghly estuary by WAPCOS ltd. in association with HR Walling Ford, UK and CWPRS, Pune. |
910.00
|
Kolkata PortTrust
|
June 2016
|
|
15 |
Studies on siltation and optimal ameliorative measures at Cochin Port. |
1073.00 |
Cochin PortTrust
|
March, 2017 |
.